Šiatorská Bukovinka

The local road leading to Šomoška Castle was rebuilt in the length of 2 km. Thanks to it, trips to the castle will be more comfortable and convenient. The original road was built in 2000 and has not been reconstructed since then. The new asphalt road is praised by many tourists, especially by those who come to the entrance area of the Šomoška NNR by vehicles.

Cesta na frad 4

Fotka cesta 1

 

© 2018 HG
The content of this web page does not necessarily represent the official position of the European Union.